Services

Electrical load study

Technical assessment of electrical infrastructure for new and existing buildings—load inventory, protection review, capacity, and expansion recommendations before installation.

Electrical load study and infrastructure planning for buildings.

The challenge

Installation or expansion without a proper load study leads to tripping breakers, miscoordinated protection, or costly redesign later.

Every building—residential, commercial, or industrial—has a distinct load profile and grid constraints that must be documented before execution.

Operational impact

  • Repeated main breaker trips
  • Unknown panel capacity
  • Expansion without a plan
  • Unassessed safety risks
  • Inaccurate vendor quotes

Engineering foundation before build

We visit the site or review drawings, analyze existing and planned loads, and assess panels, cabling, and protection.

You receive a clear report with recommendations: required capacity, expansion points, and prerequisites for solar, security, or hybrid systems.

Solution scope

  • Site visit or drawing review
  • Load and peak inventory
  • Panel and protection assessment
  • Expansion and correction advice
  • Actionable technical report

Study process

  1. Building data collection
  2. Site visit or plan review
  3. Load and capacity analysis
  4. Protection and safety review
  5. Report and recommendations
  6. Review with client

Study deliverables

  • Load and capacity report
  • Existing infrastructure notes
  • Correction or expansion recommendations
  • Requirements for follow-on systems
  • Scope estimate for next phase

Related projects

Energy storage at a logistics facility.Logistics500 kWh BESS

Aleppo, Syria

Battery storage for logistics campus

Study, design, integration, commission

Challenge

Operational backup for cooling and critical systems with switchgear space limits.

Solution

Battery sizing by load priority, hybrid inverter integration, and central monitoring.

Results

Improved backup readiness and reduced cold-chain interruption risk.

Commercial campus solar deployment.Commercial800 kWp

Latakia, Syria

Commercial campus solar project

Full delivery with handover package

Challenge

Multiple tenants and documentation requirements for post-handover O&M.

Solution

Complete engineering handover with maintenance plan and performance dashboard.

Results

Documented commissioning and periodic performance reports supporting O&M decisions.

FAQ

Is a study required before solar installation?

Yes—it ensures the system is designed on sound electrical infrastructure with adequate capacity.

Do you cover residential and commercial buildings?

Yes—any building: home, shop, factory, or campus.

Request an electrical load study

Send building location or drawings so we can scope the study and timeline.